First installation of CP to a new reinforced concrete Structure. CP of the new and existing sheet piling wall, 410 m long, with remote control and monitoring system.
Work: C.P Design, components, installation, monitoring and commissioning.
First installation of CP to a new reinforced concrete Structure. CP of the new and existing sheet piling wall, 410 m long, with remote control and monitoring system.
Work: C.P Design, components, installation, monitoring and commissioning.